ABSTRACT
This project was centered on route survey, design and volume computation of Oranyan – Olorunla village road, Atiba local government areas, Oyo state, Nigeria. The project was executed in order to provide relevant information on the route for construction purpose. The survey operations were carried out to achieve the aim which included reconnaissance, marking of chainage distance, the establishment of controls and data capture(geometric and attribute) along the route using a single frequency CHC Global Positioning System (GPS) receivers, Leica T.S together with Sokkia set Total Station. The final coordinates were used to produce detail, a profile and cross-section plan, the designing of the route was also done and the volume of earthwork for cut and fill was calculated. Lastly, plans showing the aforementioned drawings were produced in softcopy and hardcopy formats after which a comprehensive technical report was written on the executed project. I hereby recommend that the survey information obtained as well as the route design carried out in the course of this project execution should be used in the construction and rehabilitation of the said route. …